Hi,
I am new for Standard Settlement Procedures in EDM please.
Please guide whether we can use standard settlement procedure as given by SAP i.e. EXTANALYT for settlement of energy in EDM.
Actually i have seen everywhere that a Z Procedure and a z program usually gets created for this (considered for client requirement).
Requesting you, if anybody can provide any documentation for the standard settlement procedures.
We use Consumption Profiles (Synthetic Profile and Interval Profile for Consumers) and Injection Profiles (Interval Profiles) and Technical Loss as well as Resultant Profiles.
To use them, usually we create multiple installations (three installations- One for Injection Profile, Second for Consumption and third for Technical Loss and Resultant Profile) for the same Injection Point. (Is this a right practice?)
Please guide.
With Best Regards
MP Vashishth