Quantcast
Channel: SCN : Discussion List - SAP for Utilities
Browsing all 2484 articles
Browse latest View live

Write off ->Posting on different Accounts based on Main and Sub transactions

Dear All, I have an issue with posting of the Amounts on the GL Accounts during Write off. Scenario:- Provisions Article With Delivery:-Revenue Account 999 on Tax 20...

View Article


Image may be NSFW.
Clik here to view.

SAP IS-U, Automatic Productionplanning tools?

Hello, Introduction I'm Rob and In 2010 I started my education called ICT & Business at the Fontys Hogeschool (Eindhoven, Netherlands). This will be my final year and hopefully I will graduate this...

View Article


Meter Reading date – estimating EL30

Morning,Do you know how can I change the meter reading date when I run the estimation process through transaction EL30?See the problem.This customer has a custom estimation development. But, I see that...

View Article

Business partner account assignment and G/L account assignment different

Hello Experts, I am facing the issue of "Business partner account assignment and G/L account assignment different" Message no. FKKFMCHK039, while I am processing the Check lot (FP25). Notable points...

View Article

BRS Implementation in IS U -FICA

Hi Experts, I am working in IS U project, now i want to implement BRS in FICA can any one help on this please?    Thanks,Abash

View Article


High bill analysis

Hi,We are implementing an enhancement to analyze customer's bill, if the current month's bill is very high compared to previous month's bill then we have to look into some of the reasons proposed:...

View Article

Change of "Gas allocation date"

Hi experts, I'd like to manually change the "Gas allocation date" of a Meter reading document : EABL-THGDATUMI do not want to use  EXIT_SAPLEL01_009 (IS-U: Change Gas Date in Meter Reading Processing)....

View Article

Cheque print request via payment run

Hi Experts, I have a requirement in FICA where customer is refunded by cheque which is done by payment run(FPY1) and payment specification is used for this.i have created the payment media also and its...

View Article


Automatic estimation and EABL-ISTABLART

Hello experts, we used a user exists to determine estimated MR according a some logic, for example, we can make use of the same period of the previous year, or we can make use of the last 2 periods....

View Article


Re: Best Practices for installing/running UCES Application

I'm facing some technical challenges setting up NWDI 7.4 for UCES 6.05 development. First of all, out of all the required SCs for FSCM_DB, there's one (namely UMEADMIN) that cannot be checked in. I...

View Article

ERROR in note Implementation 1847570 for SEPA project

Hi ALL,      I Tried To implement note: 1847570 in ECC 6.00 SAP but I have a probleme that The package: FKK_SEPA Doesn't exist,      Please Note that by implementing this note Only the program :...

View Article

CALL FUNCTION REMOTE ERROR

Hello all,I had an error in the application abap program, in ECC6, during an RFC call of a specific function module, during settelment process.The error was logged under name "time out".After checking,...

View Article

Business partner account assignment and G/L account assignment different

Hello Experts, I am facing the issue of "Business partner account assignment and G/L account assignment different" Message no. FKKFMCHK039, while I am processing the Check lot (FP25). Notable points...

View Article


Change in price- proration problem

Hi, Please guide me about the following query:Prices are being changes from the mid of a billing period: Billing Period: 01.01.10 to 31.01.10Price Change Date : 15.01.10If a consumer is disconnected...

View Article

Quantity Proration in case of Price change for a Disconnected Installation

Hi Experts, As we know if any installation is disconnected then interpolation or Extrapolation of MR will result to Zero consumption , Logically it is correct because after disconnection you can not...

View Article


Meter Reading by Non AMI Device

Dear all, I am working on Spot Billing Application where we have not activated the AMI Business Function. But we want to capture the Meter reads from third party system thru XMLs.Since the Devices are...

View Article

Implementation for BADI ISU_IDE_EXPUSAGE_BILL not getting triggered on billing

Hi, I have done Enhancement spot implementation for BADI ISU_IDE_EXPUSAGE_BILL(Basic process EXPUSAGE). This should be triggered on billing of deregulated installation. After doing the implementation,...

View Article


ISU_QUANTITY_PRORATE rounding off the Meter readings incorrectly.

Hello Experts, We have a issue in rounding off the meter readings while estimating meter result for a billing order. When a simulation is run for 1 calendar year the consumption is calculated for the...

View Article

Job for the Transfer of the Reconcillation key into FI

Hi Friends, I have scheduled a Job through Job Container FKJOXTR with Job Type "G1 Integration FI/COPA". I have customized the event 1906 so that the TCODE FPG1M gets executed. Inorder to close the...

View Article

Changing Dunning Procedure for Item that was dunn already

Hello, Our customer wants to change the dunning procedure of the items From S1 to R1.The items were already dunn in the past: Date                            Dunning Procedure      Dunning...

View Article
Browsing all 2484 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>