Hi guys,
I have an installation which has a device valid from 25.05.2011 to valid to 31.12.9999. Now to replace the the device on 20.07.2011 with another one device I am supposed to go for Full Removal of Old device by EG32 and then Full Installation of New device by EG31.
Now after doing EG32 I have found that the day of replacement has been given wrong. Now the situation is like the old device is valid from 25.05.2011 to 18.07.2011 which is supposed to be 19.07.2011 because I have given the key date as 19.07.2011 instead of 20.07.2011.
Now I tried to go for Technical Installtion and Billing related Installtion of the Old device on 19.07.2011 but it generates a time slice in the installtion which I dont want.
What I want to do is to reverse the Full Removal which I have done using EG32 so that the old device becomes valid from 25.05.2011 to 31.12.9999 without any time slice and again I can go for Full Removal on 20.07.2011.
Pleas help me out.
- Arghya