Hi Experts,
I am trying to configure DPC but is not giving me correct results.
My scenario is:
1: when movein done, first bill will be normal billing (estimated or actual read)
2: when estimated and actual read: both period considered.
3: when actual and estimated read: only estimated read considered.
4: when actual and actual read: only current read considered.
Please check the attached configuration (DPC.docx).
How to use basic period category of the periods to set up?
Could you please suggest me?
Regards,
Priya