Hello,
Our customer wants to change the dunning procedure of the items From S1 to R1.
The items were already dunn in the past:
Date Dunning Procedure Dunning Level
01/01/2010 R1 01
01/04/2010 R1 02
01/06/2010 R1 03
01/01/2011 S1 01
Now when I change the dunning procedure of the items from S1 to R1 and run the fpva I'm getting Dunnin g procedure: R1 and dunning level 02 although I want to dunn the item from the beginning so I want it to strat from R1 and dunning level 01.
What can I do ?
Thanks,
Vered