Hi All,

 

we are using installation grouping methodology for Main & Sub scenario & Tolerance value for both before MR & after MR is 5 days .Now problem is when move out of any one of the sub happen and move out date lies in the window of "End billing period (Of Main Installation ) to End billing period (Of Main Installation ) + 5" then system is not considering that Final bill consumption of the sub installation to deduct it from Main meter consumption .  In fact if move-out date is after End billing period + 5 then system is behaving as expected .

 

Example wise :

 

If Main meter Billing period is 04.02.2013 to 03.03.2013 then if Move out of sub happen in-between 04.02.2013 to 09.02.2013 then Sub meter consumption will not get deducted from Main meter bill doc & in next month billing of Main we get error for last month unprocessed final bill of Sub .

 

If Move out of sub happen after 09.02.2013 then it is not a problem . I am not getting why this is happening . Please help 


Viewing all articles
Browse latest Browse all 2484

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>