Quantcast
Viewing all articles
Browse latest Browse all 2484

MR estimation

 

Hello Experts,

 

 

Need you help to understand this.

 

 

When I install a device at an installation I have to maintain a period consumption which form a basis for estimation when required.

 

 

In a scenario, I have a device which is installed at multiple installations(billing related), and I change the period consumption through EL56 for one contract(or installation) which does not have full installation of the device.

 

Now, when I estimate the MR for the original contract which has full installation of the device, the MR gets estimated on basis of the period consumption I maintained through EL56 for another contract, even though I have not maintained it for the contract for which I am estimating.  Could you please let me know  if my understanding is correct or not? If this is correct, can I avoid it?

 

 

Thanks,

 

Dhiraj


Viewing all articles
Browse latest Browse all 2484

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>