Final Billing Occuring with Existence of Implausible Periodic

$
0
0

Hello,

 

I have a scenario I'm wondering if anyone else has come across. A periodic order is created on Jan 1st with a scheduled meter read date of Jan 3rd. A move out is then created on Jan 2nd with the same read date of Jan 3rd. The periodic read is uploaded on Jan 3rd with a wrapped read (read is less than previous read), causing it to go implausible. The meter technician (separate from the technician that entered the periodic) then updates the move out with a plausible read. Billing runs that night and bills the move out disregarding the implausible periodic, which is not being suppressed. We do not want the periodic to be suppressed. We would have expected the billing to error out, because of the implausible read, however it is being included in the billing.

 

If anyone has come across this before, what was done to rectify this situation?


Viewing all articles
Browse latest Browse all 2484

Trending Articles