Hi,
I am having this scenario related to Device Management.
There is a premise (office premises preferably) where the client has:-
1. LeD lights with Single Phase connection.
2. AC with 3 phase connection
The client will be getting a month end bill with 0.5% Discount for LeD connection & INR 2/unit additional for 3 phase AC connection.
Pls advise from the DM point of view how to map this in the system.
1. Do we need to install 2 different Meters for single & 3 phase connections
2. Do we need to do FULL installations for the both.
Thanks,