Quantcast
Channel: SCN : Discussion List - SAP for Utilities
Viewing all articles
Browse latest Browse all 2484

EASIM _ Simulation scenario Doubt

$
0
0

Hi all,

I am doing rate category comparison using EASIM (Simulation scenario) functionality and maintained required configuration for alternative rate category.

 

If I maintained the meter reading (using El28) for next billing period and trying to run simulation for same period (start bill period and end bill period on EASIM screen)system is giving information message “Enter valid meter reading” and not allowing to simulate.

 

But whereas if there is no meter reading entered for next bill period, system is simulating bill correctly

 

Also If I change MR in meter reading tab page , it is also not working.

 

 

Am I missing something?

 

 

Using below Config:

Simulation Scen. Category: Simulation Period with Rate Category Comparison and alternative rate categories are maintained.

 

Thanks in advance,

Chetan


Viewing all articles
Browse latest Browse all 2484

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>