Hi ,
We are facing a problem while creating disconnection documents from SAP CRM. When we create a disconnection document, the disconnection order is being created simultaneously along with the disconnection document.
We hope to be able to create disconnection document from SAP CRM and disconnection order from SAP ISU. The reason for this is that fields for selection of order code and PM plant is only in ISU. (Or can they be available in CRM)
What is the standard flow of events in a disconnection scenario (customer requested) involving both CRM and ISU ?