We are facing with an issue in replication. The ISU contract had a product change via "Product Change in Same Document" action for the contract which resuled in time slice date change. This information got updated in the ISU contract but not showing up on the BP Factsheet. How do I change the end date for the 1st product in the backend? it normally determines the end date as Product change date minus 1 but for this specific contract the date did not get updated. Logs are not available since this is an old contract. Need to adjust the time slice as well as remove the error. Request your inputs please.
Rajeev